TECHNICAL ADVISORY
Independent technical expertise, from feasibility to performance review
Geobag supply is only half the equation. We provide hands-on advisory across feasibility, specification, site preparation and ongoing performance, so projects are set up correctly before a single bag is filled.
Feasibility and bag specification
Before any product decision, we assess whether dewatering is the right approach for your site and waste stream. This includes reviewing waste characteristics, hydraulic load and operational requirements, then matching the appropriate bag series..
✓ Early feasibility review against site conditions
✓ Bag size and pore size matched to waste type
✓ No overspec or unpractical set
Flocculant guidance and dewatering bed preparation
Dosing and bed preparation have a direct impact on filtrate clarity, cake formation and overall dewatering rate. We provide guidance on flocculant selection, dosing and dewatering bed layout so the system performs as intended from the first fill.
✓ Flocculant type and dosing guidance
✓ Dewatering bed layout and drainage planning
✓ Filtrate clarity and discharge considerations
Site setup advice and installation support
We work alongside contractors and site teams during setup, helping confirm pad preparation, container positioning and lift strategy are right before filling begins. This advisory role pairs directly with our installation and site support guidance.
✓ Site readiness and pad preparation review
✓ Container layout and stacking configuration
✓ Support coordinated with your team
Construction supervision and QA performance review
Beyond initial set-up, we offer construction supervision and ongoing quality assurance, monitoring dewatering performance and reviewing results against expectations, so issues are caught early rather than after they affect the project timeline.
✓ On-site construction supervision support
✓ Dewatering performance monitoring
✓ Results and documentation review
✓ Project QA and performance review

Stacking layout planning and capacity assessment
We help plan geobag stacking layouts to maximise dewatering capacity within the available tailings stack footprint. This includes preliminary layout drawings, bag orientation, spacing, drainage paths, access requirements and practical filling sequence advice before construction starts.
-
Layout planning to maximise usable footprint
-
Preliminary stacking drawings and capacity estimates
-
Bag orientation, spacing and lift sequence advice
-
Drainage, access and constructability check
Get in touch
