Port Dredging — Sediment Dewatering

The Challenges

Maintenance dredging at the Port of Adelaide produced sediment that had to be dewatered on a tight wharf footprint and managed within EPA marine-discharge requirements.

Our Approach

Feasibility and containment-cell layout, extensive flocculant selection and dosing guidance to satisfy the EPA, and on-site inspections through filling.

Results

Two stages — about 10,000 m³ of in-situ dredged material — were dewatered into stackable cake of broadly similar volume within the lined, bunded cell.

Project gallery

Get in touch

Ready to discuss a project?

Tell us what you're dealing with — waste type, approximate volume, site constraints, timeline — and we'll come back to you with a clear, practical assessment.

Email: ben.lewis@kontainsolutions.com      Phone: +61 405 812 770      Location: Henley Beach, Adelaide SA      LinkedIn →      DryStackedTailings.com →

bottom of page