top of page

Tasmania

Gold & Copper Mine — Tailings Water Management

The Challenges

Discharge limits required fine particulates removed from tailings water and contaminated underground flows before release to settling ponds — with no spare lay-down area on site.

Our Approach

Twenty-eight 1,000 m³ dewatering tubes were laid directly over soft tailings inside the TSF. Some settlement into the tailings occurred, but the units dewatered strongly and met the discharge objective.

Results

Project gallery

Get in touch

Ready to discuss a project?

Tell us what you're dealing with — waste type, approximate volume, site constraints, timeline — and we'll come back to you with a clear, practical assessment.

Email: ben.lewis@kontainsolutions.com      Phone: +61 405 812 770      Location: Henley Beach, Adelaide SA      LinkedIn →      DryStackedTailings.com →