top of page

New South Wales

Coal TSF — Redirection of Tailings Flow

The Challenges

A coal TSF needed more usable storage without major earthworks.

Our Approach

Tubes of varying diameter were pumped with slurry and arranged as berms — effectively flumes — to redirect tailings flow and open storage in targeted areas, laid over an HDPE protection mat on the existing tailings. A reminder that the system can reshape how a TSF fills, not just dewater.

Results

Project gallery

Get in touch

Ready to discuss a project?

Tell us what you're dealing with — waste type, approximate volume, site constraints, timeline — and we'll come back to you with a clear, practical assessment.

Email: ben.lewis@kontainsolutions.com      Phone: +61 405 812 770      Location: Henley Beach, Adelaide SA      LinkedIn →      DryStackedTailings.com →

bottom of page